Troy Lee Designs Flowline MTB Helmet with MIPS - Orbit - Black
HomeStore

Troy Lee Designs Flowline MTB Helmet with MIPS - Orbit - Black

Troy Lee Designs Flowline MTB Helmet with MIPS - Orbit - Black

The all-new Flowline Helmet is hand-picked, literally, by the pros and for good reason. The Flowline Helmet features a combination of comfort, safety and signature TLD style. It's NTA-8776 certified, making it the perfect choice for any rider looking to hit their local trails or cruise the streets on their e-bikes.

  • 3-Way adjustable screwless visor
  • NTA-8776 certified for E-Bike usage
  • MIPS B-Series Rotational Impact Brain Protection System
  • Full 360-degree fit retention system with 3-way rear height adjustment
  • 14 vents for maximum airflow
  • Full wrap in-mold construction
  • Extended Coverage MTB Trail Helmet
  • Side strap adjusters
  • 5-Star Virginia Tech safety rating


Select Color
Select Size
From $21.42

Original: $71.40

-70%
Troy Lee Designs Flowline MTB Helmet with MIPS - Orbit - Black

$71.40

$21.42

More Images

Troy Lee Designs Flowline MTB Helmet with MIPS - Orbit - Black - Image 2
Troy Lee Designs Flowline MTB Helmet with MIPS - Orbit - Black - Image 3
Troy Lee Designs Flowline MTB Helmet with MIPS - Orbit - Black - Image 4
Troy Lee Designs Flowline MTB Helmet with MIPS - Orbit - Black - Image 5

Troy Lee Designs Flowline MTB Helmet with MIPS - Orbit - Black

The all-new Flowline Helmet is hand-picked, literally, by the pros and for good reason. The Flowline Helmet features a combination of comfort, safety and signature TLD style. It's NTA-8776 certified, making it the perfect choice for any rider looking to hit their local trails or cruise the streets on their e-bikes.

  • 3-Way adjustable screwless visor
  • NTA-8776 certified for E-Bike usage
  • MIPS B-Series Rotational Impact Brain Protection System
  • Full 360-degree fit retention system with 3-way rear height adjustment
  • 14 vents for maximum airflow
  • Full wrap in-mold construction
  • Extended Coverage MTB Trail Helmet
  • Side strap adjusters
  • 5-Star Virginia Tech safety rating


Product Information

Shipping & Returns

Description

The all-new Flowline Helmet is hand-picked, literally, by the pros and for good reason. The Flowline Helmet features a combination of comfort, safety and signature TLD style. It's NTA-8776 certified, making it the perfect choice for any rider looking to hit their local trails or cruise the streets on their e-bikes.

  • 3-Way adjustable screwless visor
  • NTA-8776 certified for E-Bike usage
  • MIPS B-Series Rotational Impact Brain Protection System
  • Full 360-degree fit retention system with 3-way rear height adjustment
  • 14 vents for maximum airflow
  • Full wrap in-mold construction
  • Extended Coverage MTB Trail Helmet
  • Side strap adjusters
  • 5-Star Virginia Tech safety rating


Troy Lee Designs Flowline MTB Helmet with MIPS - Orbit - Black | Cambria Bike